Do I lose my warranty if I assemble a house myself?
You do not lose the warranty when you assemble the house yourself.
You do not lose the warranty when you assemble the house yourself.
80% – 90% of the construction is completed inside a factory, which mitigates the risk of weather delays, allowing projects to be completed in half the time of traditional construction.
The modules can be placed on a sleeper wall system, a concrete podium, steel podium, or a ground floor slab. For some of our KIT HOUSE house models, we offer prefabricated floor panels, which the investor installs on concrete piles prepared before installation. All dimensions and spacing of concrete piles are sent at the investor’s [...]
It is possible to produce 4,800 houses per month.
For some house models, the lead time is 24 hours. We often have houses ready for shipment in stock. Generally, we assume that the completion time is 22 – 60 days, which means that we deliver the house in less time than the setting of the concrete.
The product is manufactured and assembled in Poland, Europe.
We provide training and technical advisors to assist the general contractor to install the modules on site. We can also train the general contractor’s installation team at our factories, prior to delivery of the modules. In specific cases, SteelHous can offer the entire structural installation of the modules onto the building.
The advantages of modular manufacturing are many, but a long-term partnership provides the opportunity to invest and jointly optimize the product in order to add value whilst lowering costs.
The offer is just for you. We deliver our houses to private individuals, but also to significant developers who are fed up with traditional construction technology, which causes many problems and uncertainties.
Structurally, SteelHous Modular buildings are equivalent to conventional buildings. Their life span and warranties are also similar. However, the overall quality of modular buildings is much higher due to the controlled manufacturing process.